Request to Modify a Major Project or Concept Project
Introduction & Notes
Please Note: You will be assigned one Job Number per application for a modification to a major project. If you have multiple approvals that you wish to modify you must lodge a separate modification application for each major project approval.
Schedule 6A of the Environmental Planning & Assessment Act 1979, provides that section 75W continues to apply for the purpose of the modification of a project applications and concept plan approved before or after the repeal of Part 3A of the Act.
A Part 4 consent which was subject to clause 8J(8) of the Environmental Planning & Assessment Regulation 2000 prior to the repeal of Part 3A, can also be modified under section 75W.
This form should be used to request the Minister to modify a Project Approval or Concept Plan Approval under section 75W of the Act.
Before lodging this form you should contact the Department of Planning and Infrastructure to confirm the supporting documentation required to assess the modification. The Director General may issue environmental assessment requirements that must be complied with before your request will be considered by the Minister.
Supporting documents can be attached in Step 6 of this form. N.B. the file(s) comprising your supporting documents must be in "pdf" format, non-secured and no more than 10Mb.
Persons lodging applications are required to declare reportable political donations (including donations of $1,000 or more) made in the previous two years. For more details, go to www.planning.nsw.gov.au/donations.
Applicant Details
Title:
Mr
Firstname:
Aaron
Surname:
Sutherland
Day Phone:
0298942474
Fax:
Mobile:
0410452371
Email:
aaron@sutherlandplanning.com.au
Company:
Sutherland & Associates Planning Pty Ltd
ABN:
14118321793
Physical Address:
20 Powys Circuit Castle Hill, NSW 2154
Postal Address:
PO Box 6332 Baulkham Hills BC, NSW 2153
Site details
Site Title:
Kirrawee Brick Pit
Job Title:
Modification to MP 10_0076 - Mixed Use Development, Kirrawee Brick Pit, Kirrawee
Is new land involved?
no
Modification Details
Description:
The proposal seeks consent to amend the site layout and building envelopes of the approved Concept Plan to provide the following:
Indicative building envelopes for 8 buildings to a maximum height of 15 storeys;
85,000 square metres of gross floor area (2:1 FSR), comprising 70,810 square metres of residential floor space (indicatively 749 dwellings) and 14,190 square metres of retail/commercial floor space;
Basement, ground and above ground car parking;
Road layout to support the development;
Public park with lake and surrounding forest; and
Landscaping areas throughout the site.
Capital Investment Value:
$280,860,000.00
Construction "jobs":
630
Operational "jobs":
Landowner's Consent Provided?
Approvals
Would the development otherwise, but for section 89J of the EP&A Act, require any of the following (select all that apply)?
the concurrence under Part 3 of the Coastal Protection Act 1979 of the Minister administering that Part of that Act
a permit under section 201, 205 or 219 of the Fisheries Management Act 1994
an approval under Part 4, or an excavation permit under section 139, of the Heritage Act 1977
an Aboriginal heritage impact permit under section 90 of the National Parks and Wildlife Act 1974
an authorisation referred to in section 12 of the Native Vegetation Act 2003 (or under any Act repealed by that Act) to clear native vegetation or State protected land
a bush fire safety authority under section 100B of the Rural Fires Act 1997
a water use approval under section 89, a water management work approval under section 90 or an activity approval under section 91 of the Water Management Act 2000
Do you require any of the following approvals in order to carry out the development (select all that apply)?
an aquaculture permit under section 144 of the Fisheries Management Act 1994
an approval under section 15 of the Mine Subsidence Compensation Act 1961
a mining lease under the Mining Act 1992
a petroleum production lease under the Petroleum (Onshore) Act 1991
an environment protection licence under Chapter 3 of the Protection of the Environment Operations Act 1997 (for any of the purposes referred to in section 43 of that Act)
a consent under section 138 of the Roads Act 1993
a licence under the Pipelines Act 1967
an aquifer interference approval under the Water Management Act 2000
Online information provided by the applicant
Supporting Documents
What supporting documents are you submitting with this application? *
Note: Under clause 8F of the Environmental Planning and Assessment Regulation 2000 as it applied prior to the repeal of Part 3A, certain applications under Part 3A of the Act do not require consent of the landowner, however, the proponent is required to give notice of the application (e.g. linear infrastructure, mining & petroleum projects).
Submitted supporting files:
Landowner's consent attached?
yes
Submitted files:
Architectural Package - Part 5 - shadow plans.pdf
Architectural Package - Part 8 - SEPP 65 and RFDC statement.pdf
Architectural Package - Part 1 - comparitive analysis.pdf
Landscape report.pdf
Architectural Package - Part 5 - amenity analysis.pdf
Architectural Package - Part 7 - illustrative perspectives.pdf
Architectural Package - Part 3 - envelope plans.pdf
Updated CIV by Quantity Surveyor.pdf
Architectural Package - Part 2 - illustrative plans.pdf
Architectural Package - Part 6 - landscape plans.pdf
Political Donation
Persons lodging applications are required to declare reportable political donations (including donations of $1,000 or more) made in the previous two years. For more details, go to www.planning.nsw.gov.au/donations.
Do you need to make a political donations disclosure statement?